# Handover plan

Glossary term, read 8 Nov 2026

**The short answer.** The leaver's list of the work, the documents and the people they own, each with a named receiver and a date, written in the first days of the notice period and owned by the manager. It is the task in the leaver flow most often skipped and the one the 30-day check asks for first.

## An example, sourced

The leaver template's handover plan is due two days after notice with the receiver named on every line.

## Why it matters when choosing

On this site the term is a map column, a process step or a template line; the example above was read on 8 Nov 2026 from the page linked under Sources.

## Sources

- https://www.gov.uk/employee-leaving (read 8 Nov 2026)

Last reviewed 10 Nov 2026. Canonical: https://bestonboardingsoftware.com/glossary/handover-plan/
